SD45 Animated Detail Overlook

Endwall Girt to Hot-Rolled Rafter

This detail and animation show the installation of an upper girt in a condition that requires the girt to attach to a rafter rather than to a vertical column. This girt can be installed before or after the installation of the roof purlin that is shown in the detail.

For installation, you will need:

  • Upper/Endwall Girt
  • CL-109 Clip
  • (4) 1/2″ x 1.25″ Bolts, Nuts and (2) Washers

 

The CL-109 Clip has a different hole spacing on each end. The narrower spacing attaches to the rafter, and the wider spacing attaches to the girt. 1/2″ Washers should be used with the bolts on the girt side, and the washers should be installed against the girt rather than against the clip.

Washers are not required where the clip attaches to the rafter, but you may choose to use them.

Tip: While it may make sense to install the CL-109 clip to the girt on the ground before attaching it to the rafter, it will make installation easier to attach the CL-109 clip to the rafter using the CL-109 clip to support the girt while it is bolted into place.

Click here to view a PDF drawing of SD45 

Your Quote is on it’s way!

You should receive your estimated quote by email shortly. Please keep in mind that this is just an estimate and does not include snow loads, wind loads, county specific code requirements, delivery or design specific engineering calculations related to the structural soundness of the building.

Text Messaging

Would you like a response via text message? Opting into SMS indicates you agree to receive SMS messages regarding your request from Great Western Buildings. Message and data rates may apply. Message frequency may vary. To end messaging from us, you may always reply with STOP. You may also reply with HELP for more information.
Text Message Opt In(Required)
Hidden
Hidden
Hidden
Hidden